FG Moves To Ban Heavy-Duty Trucks From First Niger Bridge

Published

The Federal Government is considering restricting heavy-duty trucks and trailers from using the First Niger Bridge as part of efforts to address persistent traffic congestion and improve the movement of vehicles along the busy route.

The proposed measure would involve redirecting heavy-duty vehicles to the Second Niger Bridge, which officials say has sufficient capacity to accommodate more vehicles and ease pressure on the existing bridge.

According to Ireporter Online, the Anambra State Federal Controller of Works, Timothy Emenike, disclosed this development while speaking with journalists on Tuesday. He explained that the government was also considering installing barriers at both entrances of the First Niger Bridge to prevent heavy-duty trucks from accessing the facility.

Emenike noted that although the bridge’s road demarcations were designed to allow two vehicles to pass simultaneously, the situation becomes difficult when two heavy-duty trucks attempt to cross at the same time.

He explained that a heavy-duty truck and a smaller vehicle could pass alongside each other on a lane of the bridge, but two heavy-duty vehicles could not conveniently do so because of the limited space available.

The Federal Controller of Works also identified the failure of some motorists to properly remove broken-down vehicles from the roadway as another major factor contributing to traffic congestion.

According to him, vehicles that develop mechanical faults while in motion should be carefully moved away from the main carriageway to allow other motorists to continue their journeys without unnecessary obstruction.

He lamented that some drivers abandon their vehicles on the road after experiencing mechanical problems, thereby worsening traffic situations and causing avoidable delays for other road users.

Emenike further explained that diverting heavy-duty trucks to the Second Niger Bridge would help reduce the pressure on the First Niger Bridge, particularly given the wider carriageway and greater capacity of the newer facility.

He expressed concern over the underutilisation of the Second Niger Bridge despite its capacity to accommodate a significant volume of traffic.

The proposed restriction is among several measures being considered by the Federal Government to improve traffic flow, reduce prolonged gridlock and ensure smoother movement for motorists using the First Niger Bridge.

However, the proposed truck restriction remains under consideration, with no confirmed implementation date announced in the report.

Author:
ireporteronline Staff

Comments

0 comments

    Join the discussion

    Use a display name or leave it blank to comment as Anonymous. Email is not required.