FG Approves Eastern, Western Electricity Grids To Tackle Repeated National Grid Collapses

Published

The Federal Government has approved plans to develop new eastern and western electricity grids as part of efforts to address Nigeria’s recurring national grid collapses and improve power supply across the country.

According to reports monitored by Ireporter Online, the Minister of Power, Joseph Tegbe, disclosed the development during an energy conference in Lagos, noting that the government was preparing to commence the procurement process for the projects.

Tegbe said Nigerians could begin to experience the benefits of the planned grid expansion within the next two to three years, adding that the initiative forms part of broader efforts to strengthen electricity transmission infrastructure and improve the reliability of power supply.

The minister explained that the government had divided the country into three energy zones to identify areas requiring urgent intervention and ensure that available resources were directed towards the most critical challenges.

He noted that addressing transmission problems along the Lagos and Abuja corridors would significantly improve the electricity network, given the importance of the two areas to national power demand.

According to him, President Bola Tinubu had approved the commencement of the process to develop the eastern and western grids, with the projects currently moving towards procurement.

The minister also disclosed that a technical audit was underway across the country to identify specific weaknesses in the transmission network and determine the appropriate solutions for each location.

He explained that the assessment would help the government distinguish between problems involving transformers, conductors, relays, insulators and transmission towers, rather than applying solutions that fail to address the actual causes of outages.

Tegbe said the government intended to complete the technical audit within a few weeks before identifying priority areas for intervention.

Reflecting on the condition of the country’s electricity infrastructure, the minister said some transmission facilities had deteriorated over several decades, with certain structures dating back to the era of the Electricity Corporation of Nigeria (ECN), which existed before the National Electric Power Authority (NEPA).

He noted that the age and condition of some transmission towers and power lines underscored the scale of the challenge facing the sector.

The government’s proposed eastern and western grids, alongside the ongoing technical assessment, are expected to form part of its broader strategy to modernise electricity transmission infrastructure and reduce the frequency of national grid failures. However, the projected two-to-three-year timeline for visible benefits was provided by the minister as the procurement process prepares to begin.

Author:
ireporteronline Staff

Comments

0 comments

    Join the discussion

    Use a display name or leave it blank to comment as Anonymous. Email is not required.